Can your brick load survive the journey? We can help.

Reliable load containment for the brick industry

On average, a brick load is moved 3-5 times from manufacturing through its final build site. Each move results in a loss of strap tension, which can lead to a failing load.

Signode equipment, products and services are designed to help your brick loads make it through not just one move, but through to the last one.
brick_1.jpg